Green School for Boys is a free school in for 750 Pupils aged 11-16.
The contract was for Brick Slip cladding over the SFS for the Main Hall and Classroom Block and for the Sports Hall over Eurobond Panels.
A2O were engaged by Willmott Dixon two years prior to start on site to give early design input on the façade.
A2O were asked to look at cladding support solutions to deliver programme savings.
The design called for attention to detail on the large format pod window flashings and Tecu Gold standing seams feature areas of the façades.
Fire zones and compartmentalisation were another challenge.
It was important to coordinate interface detailing with other sub-contractors.
A2O suggested a long-spanning Eurobond Rainspan cladding support system for the steel-framed Sports Hall. Cladding was supported from the face of the panel, omitting the need for a stud framework and reducing build time. Panels were pre-finished on the inside, eliminating wet trades and decoration.
To achieve the design intent and ensure robust weathering details and interfaces with windows, A2O fabricated full-size mock-ups for the client and architect to comment on and fine-tune.
A2O worked closely with the fire barrier supplier and advisors to ensure full compliance.
Weekly Design Team Meetings were held with the main contractor, architects, structural engineers, glazers and roofers for full coordination and interface detailing.
Registered in England 4344380
Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.
Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. It is mandatory to procure user consent prior to running these cookies on your website.